2013 – Start on Elevators

Probably the last of the ‘heavy’ metalwork ! … Mark out the ribs for cutting

Marking elevator ribs

then test fit the elevator horn to make sure it looks like it will line up correctly. This needs to be removed and the flange holes  drilled out before bolting the two flanges in place. The stubs of the elevator leading edge will fit into these

Elevator horn

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Blog at WordPress.com.

Up ↑