Re checked the packing list and laid out at Priory Farm ready
The fittings are all cut to size and a ‘soft fit’ showed that it would be a little tricky to fit in situ. This meant a bit of judicial readiness mouting some of the brackets to the tank and bringing it all into position


Releasing existing bolts .. some of which were blind behind riveted cross members was a little tight but not impossible
The neat rubber mounts are an exact fit so great accuracy in production

Leave a comment