The new cowl is quite a significant item
Designing something to fit around the new engine and also mate with the existing body lines is quite tricky
The hours spent on the engine jig and the nose skeleton are worth it to get the finish…
Richie and Gary (at Competition Fabrications in Attleborough) tag welding it so that each quadrant joins perfectly … the nose base model has also allowed a single piece of metal to ring around it and have an indent made ..ready for the cowl hoods to mate up to the rear of the bowl.
It feels pretty light (1.5mm alloy) and the welds are using a metal that can buff in with a polished finish.
The next steps are that the basic size of cowl (front to back) and, once that size is set, we can get the engine and jig back to Priory Farm yo begine the switchover.
Ive been collating parts in readiness for this switchover:
- Prop
- Spinner, backplate and front plate
- Prop nuts and sleeves
- Cables for double throttle and choke
- Ive ordered a 2 into 1 splitter barrell for both throttle and choke ..Harvey Davison parts as advised by my good French friend Christophe
- Cooler pipes
- New fuel pipes.
- Adaptor to take the excess fuel return flow
Im sure there will be more parts …





Leave a Reply