Reached the point where I can now refit the top cabane. This was a pretty heavy evening – with careful alignment of the holes put to the test as the cabane supports fed back through and slotted back into the existing fuselage framework.
Just the front two supports to seat back into their slots and then I can start to plan cable cross bracing and, eventually, top wings
Leave a Reply