Last aileron centre horn support

Its a time for completion now ! … having focussed heavily on the wing bolts and alignment I am now in catch up to get all the other little bits completed and tidied up.

ail centre horn

We have a major air display over here in early September and I am hoping to show the Sherwood on static display – uncovered .. so want to get all the ailerons connected and completed (just aligning the return closed loop cable this week), all hinge points completed (last night) and then I can go for scalloping the leading edges (as per the model in Little Snoring). This will mean the material lies better.

Then, when all the woodwork bits have been completed I need to treat the wood with 10% thinned polyurethane to protect.

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Blog at WordPress.com.

Up ↑

%d bloggers like this: