Sam filed off the burr and edges from the seatbelt guides and then we both smoothed them off with emery. Having previously sat in the seat to get an idea of height for locating these and width we cross checked with photos from the Little Snoring open day and they looked good to go.
Pencil marks duly made, we drilled 9mm dia holes at each end and then used a dremel to trim out the guides. Then filed smooth and set pop rivets in place with backing steel washers.
Leave a Reply